Parašė sleader
Rodyti pranešimą
https://www.err.ee/1609348697/ule-15...eraraha-otsima
"The cheapest option stipulated that Riga will not be connected to the new European-wide railway, but that there will be a transfer to the existing train, which is outside Riga," said Marko Kivila, chairman of the board of RB Rail.
In this way, about 300 million euros would be saved, but the dream of reaching Riga from Tallinn in one hour and 42 minutes would be postponed to an indefinite future. During the negotiations, a solution was reached, which can be described with the words "if you can't get everything, make half".
In this way, about 300 million euros would be saved, but the dream of reaching Riga from Tallinn in one hour and 42 minutes would be postponed to an indefinite future. During the negotiations, a solution was reached, which can be described with the words "if you can't get everything, make half".

Comment