Skelbimas

Collapse
No announcement yet.

[PL] Lenkijos keliai. Vykdomi projektai

Collapse
X
 
  • Filtrai
  • Laikas
  • Show
Clear All
new posts

  • Romas
    replied
    SSC yra didelis. Gal būtų galima paprašyti konkretesnės nuorodos.
    Nepakenktų nurodyti ir autorių

    Komentuoti:


  • Smauglys
    replied
    Primena kaip žiūrėjau dokumentiką apie USA super highways kaip statė, ten apie 1950 metus (ar panašiai). Įspūdingai atrodo.

    Komentuoti:


  • groundzer
    replied






    Šaltinis: http://www.skyscrapercity.com/showth...41854&page=234
    Paskutinis taisė groundzer; 2010.06.03, 22:21.

    Komentuoti:


  • groundzer
    replied
    Dar vienas įspūdingas greitkelio projektas. Man asmeniškai Lenkijos kelių statybos mąstai švelniai tariant, tiesiog atima atima žadą.

    [A8] Wroclavo miesto aplinkelis



















    Komentuoti:


  • pzlotnik
    replied
    A1 highway construction site in Silesia Region (section Pyrzowice - Gorzyczki near Czech boarder):

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    Komentuoti:


  • pzlotnik
    replied
    Most roads will be built with help of EU funds. Poland got 70 bil. EUR for period 2007 - 2013 and most of this money will be spent on infrastructure. So in 2013 Poland will have european stadard road network. Whole seen on this map will be finished until 2014.

    Unfortunately S61 expressway that connects Lithuanian Border with Warsaw will be finished until 2015 (parts of this road will be ready earlier: Suwałki and Augustów bypass, Szczuczyn baypass).

    Same as Rail Baltica...is put away for the future. Now priority for Poland is E2012 tournament and western parts of country where traffic is the most dense.

    Komentuoti:


  • liutass
    replied
    Money from EU?

    Komentuoti:


  • pzlotnik
    replied
    At the moment in Poland we have under construction:

    Highways -362 km

    2 Roadways x 2 Lanes Expressways - 406 km

    1 Roadway Expressways - 23 km

    So construction works are huge.

    Now we have in use:

    Highways - 920 km

    Expressways - 610 km

    There are tenders closed for another few hundreds km of Highways ana expressways so contruction should start soon:




    Green - existing
    Red - under construction
    Violet - undergoing project (in project and build closed tender)
    Yellow - tender
    Brown - tender (project and build system)
    Blue - enviromental decision undertaken (next step tender)

    Komentuoti:


  • pzlotnik
    replied
    Expressway Poznań - Gniezno is being built in Wielkopolska Region. Some Facts:

    Wielkopolska Region:

    Area - 29 826 square km
    Population - 3 403 174

    Lithuania:

    Area - 62 200 square km
    Population - 3 322 200

    So we have much bigger problems with private property when building roads. When I was driving through Lithuania there are huge emty spaces, in Poland we have w lot of small town and villages so sometimes there is no space to build new road.

    The biggest problems with land there are in Śląskie Region in southern Poland:

    Area - 12 333 square km
    Population - 4 654 115.

    Komentuoti:


  • music
    replied
    Ar pas lenkus nėra problemų su privačia nuosavybe ar kaip čia išeina?

    Komentuoti:


  • blitz
    replied
    These pictures are music to my eyes! Beautiful stuff.

    Komentuoti:


  • groundzer
    replied
    Massive road works. Great, that Poland roads infrastructure keep going into positive direction.

    Komentuoti:


  • pzlotnik
    replied
    16

    17

    18

    19

    20

    Komentuoti:


  • pzlotnik
    replied
    11

    12

    13

    14

    15

    Komentuoti:


  • pzlotnik
    replied
    6

    7

    8

    9

    10

    Komentuoti:


  • pzlotnik
    replied
    Poznań - Gniezno Expressway -The of limited availability, used exclusively for traffic vehicles, equipped with two roadways (each road has 2 lanes plus emergency lane), having multi-level crossing intersecting. Lenght - 45 km.
    Will be finisher by june 2012.

    The road in brown rectangle.



    1

    2

    3

    4

    5
    Paskutinis taisė pzlotnik; 2010.05.09, 20:43.

    Komentuoti:


  • pzlotnik
    replied
    Parašė John
    Yes, makes sense. I just wonder how about ride comfort? Concrete is much harder and therefore tyre noise is much more noticeable (especially in smaller cars). Or is there some technology that helps to avoid that?
    Try Vienna bypass after alternation. It`s made of concrete and comfort is very good. When concrete is plain and well laid there`s no problem with noise and comfort. But older concrete technologies were of course not so good.

    Komentuoti:


  • pzlotnik
    replied
    Parašė John
    Why are they choosing concrete? I thought tarmac is the option in most new highways? Or are there any advantages?
    Concrete is much more permanent pavement than tarmac. First alternation is needed after 20 - 30 years of use.

    Most modern highways in Germany or Austria are of concrete. Lately opened A4 section in Poland to German border - Krzyżowa is from concrete:





    How it looks on A2 highway (test concrete section is ready):










    It`s very modern german technology:

    Section of the test is performed to verify the technology, machines and procedures for receiving, in practice, or on site. Laying of concrete pavement is working "band" and will continue for the next three days, ie until 22 November 2009. This type of concrete section is laid for the first time in Poland in the new technology that is "concrete pavement with exposed aggregate" so-called "washbeton. This technology was developed several years ago and is now used in countries such as Belgium, Austria and Germany, where since 2007 is the standard technology for concrete pavements for highways. Works are performed by Heilit & Woerner, STRABAG, which has more than 29 years experience in concrete pavements, including 16 years in Poland.

    Before you start laying the concrete slab, has been previously arranged and attached geotextile which acts as a separating layer and dehydration. The construction of pavement base course consists of a thick. Of 20 cm of lean concrete, under a layer of lean concrete base course made Frost a layer thickness. 32 cm.
    Positioned today surface of the concrete slab consists of 23 cm bottom layer of concrete and 5 cm top layer of concrete. Both layers are designed so that together they can cope with the enormous movement of cars projected to pressure of 115 kN / axle for more than 30 years.

    "By construction, the company A2Strada (Kulczyk Holding Strabag), zdecydowałsię the implementation of the test right now because of the possible opportunity to refine the technology chosen for this year, before the start of full construction season in the spring of 2010" - explains CEO Andrew AWSAII Patalas.

    Komentuoti:


  • pzlotnik
    replied
    That part of A2 Highway section from Nowy Tomyśl to German Border (lenght 106 km) will be finished to november 2011 and will have concrete surface, like many german highways.
    By june 2012 A2 will be ready from german border to Warsaw (exactly to Minsk Mazowiecki, east to Warsaw), total lenght of 472 km.

    Komentuoti:


  • liutass
    replied
    Parašė groundzer Rodyti pranešimą
    Kas per kvailas klausimas Lenkai ir savų darbininkų, inžinierių turi.
    Kiek zinau, tai Kauno tiltai su TILTRA Group ten varo pilnu tempu.

    Komentuoti:

Working...
X