Skelbimas

Collapse
No announcement yet.

PL. Poznanė / Poznań

Collapse
X
 
  • Filtrai
  • Laikas
  • Show
Clear All
new posts

    #41
    5 new office buildings will be built in Poznań on Grunwaldzka street. The first one of the new complex is called Pixel will have 33 000 sq m of total area nad 420 places in underground praking lot.

    The building will have 10 floors (3 underground).

    It will be hired for Allegro headquatters.

    The 2nd building in the complex contstruction will start before finishing the 1st one. The whole complex is provided for IT business.

    The construction is going to statr in a few days and 1st builind will be finished by Oct 2012.

    When all buildings will be finished it will give Poznań about 100 000 sq m of office space to let.









    Comment


      #42
      Poznań MM Shopping Mall constrution Site, will be ready in 2012:



      Visualisation:



      Comment


        #43
        Small, but nice - new apartment building on Garbary Street, quite in Poznań center:



        Construction in progress:



        Comment


          #44
          by Pawelski:























































          Comment


            #45
            Poznan - controvertial castle reconstruction :













            Construction of the castle was probably started by Przemysł I in 1249 on hill later called Góra Zamkowa (Castle Mountain, Latin mons castrenis), and now better known as Góra Przemysława (Hill of Przemysł (or Przemysław)). The first building was a habitable tower made of bricks with a well inside, and the rest of the hill was surrounded by a rampart with a palisade. A small ducal residence was incorporated into the system of city walls in the late 13th century.

            The son of Przemysł I, Przemysł II, hoping for reunification of Poland under his rule decided to build a larger castle, more proper for a king. In 1295 Przemysł became king of Poland, but he was assassinated a year later. The castle wasn't finished. Work started by Przemysł was continued by a branch of the Piasts from Głogów ruling in Greater Poland, and finished before 1337. The castle served as the residence of prince Casimir, then-governor of Greater Poland.

            In 1337 the Royal Castle in Poznań was largest castle in the Polish Kingdom, modeled after the palatium of Henry I the Bearded in Legnica. The castle consisted of a tower built by Przemysł I and a huge building (63,0 m x 17,5 m) with three levels and a basement. It's not certain if the castle's characteristic roof, consisting of four parts existed at that time.

            Basements served as prisons and for storage of wines, and on the ground floor there were charring rooms. Those two condignations were covered by vaults. Two higher floors probably had wooden ceilings. On the edges of first floor were representative chambers, and between them were habitual rooms. The whole second floor was occupied by achamber for 2000 guests. On the south end of the large building was a defense tower. Since the reign of Władysław I the Elbow-high the castle served as the residence of starosta generalny of Greater Poland. Later only one king, Władysław II Jagiełło, ordered some minor work in castle.

            During the fire of Poznań in 1536 the castle also burned. It was rebuilt in the renaissance style by the governor of Greater Poland, Andrzej II Górka. In the next years the oldest part of castle was transformed into a kitchen. The castle was later destroyed during the Swedish invasion, sacked in 1704 by the armies of Russia and Saxony during Great Northern War, and in 1716 during Confederation of Tarnogród (konfederacja tarnogrodzka) by the confederates. The castle was partially renovated in 1721, but it didn't stop the devastation. The last starosta generalny, Kazimierz Raczyński, rebuilt the remains of the medieval buildings into an archive (finished in 1783). In 1704, after The Second partition of Poland, Prussians demolished the southern part of the castle, replacing it by buildings which, together with Raczyński's archive served as the office of the local Regierungsbezirk. Later on the castle was also as a seat of the Court of Appeals and the State Archive (the castle served as an archive until 1939). During the battle for the Poznań Citadelle, in February 1945, Przemysł Hill was in line of artillery fire, and the remaining part of the castle was demolished.

            On 22 April 2002 a committee for rebuilding of the castle was founded.

            Another interesting project - Interactive museum of the history of 'Ostrow Tumski' (Cathedral Island) :












            'Ostrow Tumski' (Cathedral island) from above :

            Comment


              #46
              pic by sirGregor :

















































              pic by PieEetrek :





























              Comment


                #47
                http://www.businessgarden.pl/poznan/the-project.html

                SwedeCenter is a real estate investment and development company active on the Polish commercial real estate market.

                SwedeCenter has operated in Poland since the early 1990's along with its parent company Polprop Holding of the Inter IKEA group. The company has already completed several office buildings.

                The projects of SwedeCenter are characterized by a prime location, flexibility in the arrangement of office space, and functionality. The company operates in major Polish cities.

                The first green office park in Poznan, offering ca 85,000 m2 in 9 buildings.

                In the `st phase (faza I) 4 buildings will be build.




                Visualisations:











                Paskutinis taisė pzlotnik; 2011.07.26, 20:54.

                Comment


                  #48
                  Wilson Office Park
                  Leasable area 16000m2
                  Starting investments Q3 2011





                  Comment


                    #49
                    Malta House - Skanska Property Poland


                    Malta House is a project of six-storey building, which will offer for sale of about 15 000 m2 of modern office space. The underground car park will be located approximately 300 parking spaces available to tenants. Malta House will be the first green investment in Poznan, which will be carried out in compliance with the principles of sustainable construction. The building will meet all the standards required by the LEED rating system for real estate and Green Building. The investment will feature environmentally friendly solutions to a significant reduction in operating costs and allowing the building to create a microclimate inside the building the highest quality. These solutions will provide users of the building comfortable, friendly and safe working conditions.




                    Comment


                      #50
                      http://www.okraglak.pl/en/home.html

                      The most commonly recognized building in Poznań will become a modern office building, at the same time regaining its original look and glamour.

                      The renovated Okraglak will consist of 5100 sq. m of class “A” office space situated on 8 floors and additional 1100 sq. m of trade, services and gastronomic space.

                      Planned opening date – April 2012

                      ABOUT OKRAGLAK
                      Revitalization
                      The revitalization of Okrąglak will restore the attractive and original appearance of the building – already listed in the register of historic monuments – and at the same time will convert it into a modern office building with commercial facilities and restaurants on the ground floor

                      New Okraglak means:

                      - The new Okrąglak will gain the status of class “A” office building and will meet all the criteria of a modern and intelligent commercial site
                      - A faithfully rendered modern exterior architecture along with a new interior design, incorporating original decoration, will highlight the artistic elements of the site as a whole.
                      - All architectural characteristics preserved with greatest care, along with the application of necessary modern logistic solutions inside the building.
                      -Shops and a restaurant on the ground floor
                      - Location in the city centre and vicinity of the main communication routes







                      Comment


                        #51
                        Pixel Office Park under contruction - 33 00 sq meters of leasable space:









                        Paskutinis taisė pzlotnik; 2011.07.26, 21:13.

                        Comment


                          #52
                          Andersia Business Centre (app. 14.500 sqm net usable area, underground car park with 150 parking places) is the third phase of Anders Square development. The high class office complex will be located in the centre of Poznan in front of the Poznan Financial Centre and Andersia Tower Buildings in the neighbourhood of the Old Town, Stary Browar and Poznan International Fairs.

                          The 5-storey Andersia Business Centre has been designed by the Architectural Studio of Ewa and Stanisław Sipinski.





                          Construction Works:






                          Comment


                            #53
                            It seems that up to 2016 there will be 200 000 sq meters of new office space in Poznań :-).

                            I havn`t shown everything what is beign build or will be build in the matter of office space soon in Poznan.

                            Comment


                              #54
                              New Poznan University of Technology building - Department of Nano Engineering, almost ready:









                              Comment


                                #55
                                Biology Center of Medical University in Poznań:













                                Comment


                                  #56
                                  Pavilion for Poikilotherm animals in the old zoo in Poznan :



























                                  Comment


                                    #57
                                    Termy Maltańskie Poznań - swimming pool complex with recreational part and olimpic 50 m pool and jump tower with 3900 audience at the Malta Lake:






















                                    olimpic 50 m pool and jump tower with 3900 audience





                                    Comment


                                      #58
                                      Parašė pzlotnik Rodyti pranešimą
                                      It seems that up to 2016 there will be 200 000 sq meters of new office space in Poznań :-).

                                      I havn`t shown everything what is beign build or will be build in the matter of office space soon in Poznan.
                                      First of all Poznan is very beautiful city, thanks for sharing with us .
                                      About the office space, it's quite impressive numbers, and as I can see in photos, lots of new projects are developing .

                                      Comment


                                        #59
                                        Interesting type of advertisement prepared by IKEA in Poznań using tram stops .

                                        The campaign is to show that living on a small area does not necessarily mean having to abandon the dream, you only need a little bit smaller.

                                        Furthermore, the inhabitants of Poznan will be able to see how the IKEA products in the functional way to decorate even the smallest space, making it cozy at the same time.











                                        All furniture is real, no fake.

                                        Comment


                                          #60
                                          Termy Maltńskie with Olimpic 50 m swimmig pool nad aqapark construction site from above - photos by Carte - open from Oct 2011:





                                          Comment

                                          Working...
                                          X